The first train of Hanoi’s second metro line, Nhon-Hanoi Railway Station, is en route to Vietnam, Kinhtedothi.vn reported, citing the Hanoi Metropolitan Railway Management Board (MBR).
The first train has been completed, and calibrated with all the interior hardware installed for the test run in the factory campus in Valenciennes, France, the MBR said, adding that the train is expected to arrive in Vietnam’s Hai Phong port on October 24 instead of July as planned due to the Covid-19 pandemic.
This is the first of four trains being produced for the line out of a total of ten. The second will arrived in January 2021 and all the ten will be ready in the country by next June.
The Nhon-Hanoi Railway Station metro line, the second route after Cat Linh-Ha Dong, spans 12.5 kilometers from Nhon in the western district of Nam Tu Liem through Kim Ma street to the Hanoi Train Station in the downtown area.
It will run 8.5 kilometers on elevated tracks through eight stations and the remaining four kilometers underground. The underground track is scheduled to be inaugurated in 2022.
The total cost of the project has been adjusted upwards to EUR1176 billion. Of the total, EUR178.7 million is sourced from ODA fund provided by the French Development Agency (AFD) and EUR355.1 million are loans French government loan.
It is one of several metro lines planned for the capital city to ease traffic congestion and reduce emissions.
The followings are photos of the first train of Hanoi’s second metro line:



Alstom Group (France) is the supplier of the integrated subway system for Hanoi’s metro line 3 project.


- First train of Hanoi’s second metro line arrives in Vietnam
- First train of Hanoi’s second metro line undergoes test run in France
- Train for Hanoi’s 2nd metro route to arrive next month
- Ongoing Nhon-Hanoi Railway Station Metro Project opened for visitors
- Hanoi’s second metro project progresses on schedule
- Train for Hanoi’s 2nd metro route arrives in Hai Phong port
- Another metro line in Hanoi conducts trial run
- Germany mega machine TBM ready for Hanoi’s subway drilling
- Contractor for Hanoi metro demands compensation for land handover delay

